KD Building Company Begins New Commercial Build-Out for Sharkey’s Cuts for Kids in Green Bay, WI
- marcinj31
- Dec 2, 2025
- 2 min read
KD Building Company is excited to announce the start of a new commercial construction project in Green Bay, Wisconsin—a full interior build-out for Sharkey’s Cuts for Kids, a popular national children’s salon franchise. As Sharkey’s continues to expand across the Midwest, our team is proud to deliver a high-quality space tailored to their fun, family-focused brand.
This commercial renovation project includes demolition, framing, plumbing rough-in, electrical rough-in, and insulation, all of which are now successfully completed. With the foundation of the space prepared, the project is on track for the next stages of construction and interior finishing.
Phase 1: Commercial Demolition Completed
KD Building Company began the project with a full interior demolition to prepare the site for a complete transformation.This included:
Removing outdated walls and partitions
Opening floor sections for new plumbing routes
Clearing damaged flooring and ceiling materials
Preparing the interior for new mechanical, electrical, and plumbing systems
The demolition phase also allowed our team to analyze the existing structure to ensure all future work meets commercial building codes in Wisconsin.
Phase 2: Metal Framing Installed for the New Interior Layout
After demolition, our crew installed durable metal stud framing, essential for any modern commercial build-out. The new framing outlines:
Hair-washing stations
Reception and waiting areas
Kids’ styling stations
Storage and utility spaces
This structural framework sets the foundation for drywall and final finishes that align with Sharkey’s playful and welcoming design standards.
Phase 3: Plumbing Rough-In Completed
Because a children's salon requires multiple wash stations, commercial plumbing work was a major part of the early phase.Our licensed plumbers:
Installed new drain and supply lines
Cut and re-poured sections of concrete to accommodate plumbing routes
Prepared all valve locations and fixture rough-ins
Ensured compliance with Wisconsin plumbing codes
The project now has all plumbing infrastructure in place for the upcoming installation of sinks and wash station equipment.
Phase 4: Electrical Rough-In Completed
Our electrical team completed the commercial electrical rough-in, including:
New wiring and circuits
Ceiling electrical for lighting and HVAC
Power supply for salon equipment
Low-voltage lines and additional data connections
These upgrades ensure the salon will operate efficiently and safely once open.
Phase 5: Insulation Installed
To improve comfort, sound control, and energy efficiency, KD Building Company installed high-quality wall insulation throughout the interior framing. This step is crucial before beginning drywall installation.
What’s Next for the Sharkey’s Cuts for Kids Build-Out?
With demolition, framing, plumbing, electrical, and insulation completed, the project is moving into the next major phases:
Drywall installation
Taping and finishing
Ceiling grid completion
Flooring preparation and installation
Millwork and cabinetry
Interior paint and finishes
Final inspections
Once completed, this new Sharkey’s Cuts for Kids location in Green Bay, WI will provide a vibrant, fun, and efficient space for families—built to last by KD Building Company, a trusted leader in Midwest commercial construction and tenant improvements.
Why Businesses Choose KD Building Company for Commercial Construction
KD Building Company continues to serve Wisconsin and Illinois with reliable, high-quality construction services. From retail build-outs to office renovations, our team specializes in:
Commercial remodeling
Tenant improvements
Franchise build-outs
New interior construction
ADA upgrades and compliance
We’re proud to help growing businesses like Sharkey’s bring their vision to life.























Comments